Heat pump accelerator & boiler ban timeline 2026
DESNZ is pulling heat pump demand forward with new grants while delaying the gas boiler ban. Rebuild your Toolfy pipeline accordingly.
Operations disclaimer
Always follow manufacturer guidance and local regulations when stocking chemicals, pressurised cylinders, or regulated waste.
Heat pump accelerator & boiler ban timeline 2026
DESNZ confirmed that the Heat Pump Investment Accelerator (HPIA) will open nationally in 2026, while the 2035 gas boiler ban may slip for existing homes. Installers need to juggle accelerated grant demand with customers who aren’t ready to ditch boilers yet. Here’s how Toolfy helps you stay organised.
1. Key policy updates
- HPIA: £7,500 grants for households installing high-efficiency heat pumps, with extra bonuses if contractors bundle smart controls.
- Boiler ban timeline: no outright ban until 2035, but new builds and off-gas homes face earlier pressure.
- Hybrid encouragement: government wants hybrid heat pump + boiler systems for certain housing stock.
2. Segment your pipeline
- Create job types for
Heat pump grant,Hybrid install, andBoiler-only. Tag each lead accordingly. - Use Toolfy CRM filters to forecast install capacity per category so you don’t overbook crews on grant jobs.
- Add custom fields for grant status (pre-qualified, submitted, approved) and export weekly.
3. Documentation + compliance
- Build a checklist that mirrors the HPIA application: MCS number, property type, SCOP rating, £ breakdown.
- Require uploads of EPC certificates, photos of cylinder cupboard, and existing boiler serial numbers.
- Store customer consent for data sharing (grant apps) in Documents.
4. Cash flow tactics
- Take deposits (30–50%) on grant jobs even if the subsidy covers the rest. Use Toolfy milestone invoicing: deposit, mid-way inspection, completion.
- For hybrid installs, create a single quote with optional upgrade lines so customers can phase spends.
- Track grant receivables vs customer contributions separately to understand true margins.
5. Customer messaging
- Prepare two nurture sequences: one for “grant ready now” (fast-track survey + install) and another for “watchlist” customers (updates, financing options, hybrid explainers).
- Add a FAQ block on quotes about the boiler ban delay so homeowners aren’t confused.
6. Timeline
| Date | Action | | --- | --- | | Q1 2026 | Train sales and installers on the HPIA checklist; update Toolfy templates. | | Q2 2026 | Launch hybrid/boiler nurturing campaigns; tag leads accordingly. | | HPIA launch | Submit first batch of applications; monitor approval times in Toolfy. | | Post-launch | Review grant vs non-grant margins monthly; rebalance marketing spend. |
Need the grant checklist or nurture copy pack? Email support@toolfy.io and we’ll drop them into your workspace.
⚠️ Important Disclaimer
This guide is for general informational and educational purposes only. It does not constitute professional advice of any kind (legal, financial, tax, insurance, or otherwise).
Before making business decisions: Consult with qualified professionals (solicitors, accountants, insurance brokers, etc.) who can assess your specific circumstances. Laws, regulations, and industry standards change frequently and vary by location and situation.
Toolfy and the article authors accept no liability for decisions made or actions taken based on information provided in this guide. You are solely responsible for ensuring compliance with all applicable laws and regulations.
Frequently Asked Questions
What is the Heat Pump Investment Accelerator (HPIA)?
When is the gas boiler ban happening?
How should installers prepare their pipeline for heat pump grants?
Need this workflow in Toolfy?
Spin up the exact checklist, scripts, and automations from this article inside your workspace.
Related Articles
Consumer Duty deposit rules 2026
FCA's 2026 update tightens how small service firms take and refund deposits. Here's the Toolfy-ready compliance checklist.
DVSA 'safe van' spot checks 2026
Roadside inspections ramp up next spring. Make sure your micro fleet has digital checklists, insurance proofs, and Toolfy logs ready.
ECO4 grant paperwork workflow inside Toolfy
Stay audit-ready for ECO4 grant installs with structured job types, document folders, and submission checklists built into Toolfy.

